Brought to you by Chrystal Roggenkamp of
The Portland Hearthbeat | Part of Urban Nest Realty
Peninsula Park
Bungalow
In Piedmont
5916 North Moore Avenue
$699,000 | 4 Bedrooms | 1.5 baths | 2,120 SqFt
xxx!
Read below to discover stories and additional details beyond what you’ll find on the MLS.
Highlights
-

Steps From Peninsula Park
-

Expansive Kitchen With Island
-

Quintessential Portland Charm
-

Spacious Walk-In Closets
-

Updated Systems
Upgrades + Features
-
-
-
-
-
Item description
-
-
-
-
-
-
Item description
The seller has put a lot of care into this home over the years. Their pride of ownership shines through—from functional upgrades to stylish touches, they’ve kept this home looking good and running smooth.
The Roseway Neighborhood
Roseway residents love the neighborhood for its tree‑lined streets, friendly neighbors, and warm sense of community. It has cozy local spots, parks where pups and kids can run, and easy access to restaurants, breweries, and shops without the chaos of downtown. It’s the kind of place where weeknight strolls are part of the everyday rhythm, sprinkled with the quintessential east side Portland charm we all know and love.
[ CLICK MAP TO ENLARGE ]
Nearby Favorites
ClICK THE ARROWS AT THE BOTTOM TO SCROLL
“The house sits in a super convenient location as far as getting around goes. Being just 5 blocks north of Sandy makes it easy to zip across the east side or hop onto I-84 for longer commutes.
The neighborhood is more walkable than I originally realized, and has grown a lot in recent years. There’s multiple grocery stores and coffee shops within walking distance, and I love having spontaneous hangouts with friends at nearby spots like Pete’s and High-Top Tavern. Beaumont Village and the Hollywood District are nearby and have so many fun things to do and great restaurants to try.”
First Impressions
“When I first found the house, I loved that it had a huge yard for gardening, bright and spacious rooms with large windows, and an fantastic basement.”
The main living space is a standout, anchored by a fireplace recently refreshed with a stylish ceramic tile surround and clean lines that nod to the home’s mid-century roots. A delightful archway frames the dining area, where thoughtfully curated brass light fixtures add warmth and polish. The open nature of the space acts as a fantastic backdrop to both everyday living and social gatherings with friends and loved ones.
“I have so many memories from my time living in this home. The neighbors are incredible…good people, lots of support for one another.”
We raised two puppies, and watching them grow up and play with their friends in such a great backyard was truly special. We hosted many summer BBQ’s and had so many great dinner nights under the covered patio,”
Revamped Kitchen
The kitchen features stainless steel appliances and has been refreshed with quartz countertops, an undermount sink, a pull-down spray faucet, refinished cabinetry, and new fixture to create a clean, modern space that’s both functional and inviting.
Room To Grow
Dreaming of a luxury kitchen? While the current kitchen is solid, the main level floor plan makes expansion possible without sacrificing key living spaces. This plan diagram shows one potential future layout. Removing the wall separating the laundry would create 200+ SqFt of kitchen area for abundant countertops and storage. Laundry can be relocated or seamlessly integrated within cabinetry to conceal a stackable unit. Dream away, my friend!
* DISCLAIMER: This illustration does not reflect the current existing layout of the kitchen. It is for marketing purposes only not intended to form part in any contract or warranty. Buyer to perform due diligence to confirm feasibility and code compliance of any future renovations.
“The morning light is particularly great in morning. It’s a nice place to start the day with your first cup of coffee.”
Lower Level Potential
-
-
-
-
Item description
-
Item description
“A big draw for me with this home was realizing that there’s a whole other house downstairs! We put a lot of effort into modernizing the systems and making it usable. We had plans to finish it out one day, but life happened and now it’s ready and waiting for the next owner’s vision.”
An Oversized Yard For Farm To Table Living
The yard is a dream for gardeners, urban farmers, and those seeking extra space where people and pets can play freely. A fenced garden area w/ideal sun exposure sets the stage for thriving vegetable beds and plenty of farm-to-table dinner party inspiration. Just off the garage, a covered patio creates a perfect spot to gather, rain or shine. The long driveway provides convenient RV parking.
“The yard has so many beautiful blooms and plant life. I love the tri-green of the persimmon tree. The lavender is a huge bee draw and lovely. You can get the hydrangea to change colors with the proper care. The front yard tree has showy white flowers. May is generally the best time for all the blooms.’
“We hosted a lot of outdoor gatherings out back, oftentimes with neighbors. I would BBQ on the grill while everyone played yard games and hung out. It’s a great space for gathering.”
Explore The Layout
Sign Up For Updates On This Listing
Click the button below to receive communication about offer deadlines on this listing. If you’re working with an agent, please have them reach out to Chrystal, the listing agent, for details.
The Photos
Chrystal
Roggenkamp
Licensed OR Realtor + Architectural Designer
The Portland Hearthbeat | Part of Urban Nest Realty
503.310.9056 | chrystal@theportlandhearthbeat.com
Hello! It’s my honor to represent the wonderful sellers of this charming home. My clients and I have worked hard to get the home in tip-top shape for the next owners and hope that you enjoy it! If you have any questions or are interested in submitting an offer, have your Realtor contact me by phone. It would be our pleasure to work with you to make this adorable house your home!

